欢迎来到深圳市友创光显有限公司官网!服务热线:0755-23577586
专业以研发为核心制造为根
本的液晶显示模组高新企业
新闻中心
推荐产品
Module processing considerations.
时间:2018-03-31 阅读: 5044
   1. The external lead of the liquid crystal module is not allowed to be connected wrongly, otherwise it may cause excessive flow, overpressure and damage to the module device.

2. When the module is connected to the power supply and disconnected, it must be connected with the positive power (5 + + 0.25v) to enter the signal level. For example, the IC circuit of the module may be damaged before the power is stabilized or the input signal is switched off.

3. The solder iron temperature: 280 + 10 ℃ welding time: < 3-4 s; Welding materials: eutectic, low melting point; Repeat welding shall not exceed 3 times.

4. Press hard on the display area, which will produce an abnormal display. When the power is switched off, wait for a moment and then return to power.


联系我们
深圳市龙华区观湖街道鹭湖社区观乐路5号多彩科创园B座1411
联系人:洪生13823667054
电话:0755-23577586
传真:0755-23577596
邮箱:368753933@qq.com
网址:www.yclcd.com

扫一扫 更多精彩
Copyright   深圳市友创光显有限公司.All rights reserved.  粤ICP备17160190号